Client: Stratford-Upon-Avon District Council
Start-ups and small businesses can now take advantage of a newly-transformed business centre located on Avenue Farm Industrial Estate
The centre, which opened its doors in spring 2016, is owned and managed by Stratford-on-Avon District Council, has been supported and funded by WCC and enabled as part of a Growth Deal with Central Government. It has been designed to provide the best possible base for new businesses starting up, small businesses wishing to grow and businesses making the transition from a home-based environment into commercial premises.
Brief: We were appointed to design and cost a gas fired heating system to a traditional radiator installation along with a calorifier to provide hot water. We also carried out the design and installation of cold water services and extract systems.
Action: We designed and installed the systems with an industrial feel to compliment the design of having all mechanical and electrical services on show. The design was based around the improvements made to the buildings environmental impact through more efficient materials.
Our sister company FMS now carry out the on-going maintenance of the systems.
Category: Case Studies
10th Floor Edmund House
Client: Gleeson Recruitment Group
Gleeson Recruitment Group was set up by the three Directors in 2011, with the vision of creating a business founded on trust, transparency and integrity – everything they felt the industry lacked.
Since then they have grown with their success, and have branched out by obtaining talented and experienced staff who embody the same values around customer service. We now cover Accountancy & Finance, Engineering & Manufacturing, Human Resources, IT, Procurement & Supply Chain, Transformation and Executive Search, as well as offering a range of HR services such as psychometric testing and profiling and outplacement provision. We have also expanded geographically covering the majority of the UK from our offices in Birmingham, London and Reading.
Brief: We were appointed to design and install mechanical modifications to a Cat A fit out and ensure that the clients contemporary design and layout was not compromised by any services.
Action: We worked with the main contractor and their designer to achieve a comfortable environment for staff. The project required specific design emphasis on coordination of very tight service voids and restricted space for additional plant.
Our sister company FMS now carry out the on-going maintenance of the systems.